Engines transported by rail

12/2014 – 1/2015

Break bulk OOG + containers. 2 blocktrains / 47 wagons, tot. 1 093 tons

The project consisting of 47 wagon loads was planned jointly with the shipper in Finland and representatives of the Russian consignee consisting of engineers, transport- and customs professionals.

The heaviest engines of 60 tons each were transported on 8 axels RZD transporters in a group of 6 wagons. It put pressure on just-in-time loading, lashing and securing of cargo during short time and extreme winter conditions in Finland.

Hacklin Hamiko succeeded to ship the cargo 2,5 weeks before the deadline in order to reach winter road conditions in Siberia.